Biltmore Lake Sedimentation Mitigation
Asheville, NC
RDE was hired by the Lake Committee of the Biltmore Lake POA to identify causes of excessive sediment accumulation in a cove of Enka Lake, communicate findings, and develop design solutions. We identified 22 problem areas in the watershed that were contributing to sediment accumulation. RDE presented a range of solutions for each problem area type, as well as several design options for a sediment trap to catch sediment before it reaches the lake and provide a clean-out. The nature-based design solutions include low-tech stream restoration, bioretention areas, bioswales, and a floodplain activation area. RDE’s data and recommendations combined with the Lake Committee’s values and priorities drove the selection of design solutions that make up the pilot project.
Eroding stream banks were one source of sediment accumulating in the lake cove
Problem area map
Overview map